There's no inconsistency with BSEE selecting not to require appeal bonds at the phase of an buy to decommission and BOEM determining to call for them within the stage of economic assurance calls for. The BSEE conclusion is predicated largely on the assumption that economical assurance is by now in place by the point it difficulties decommissioning